Demo ILC All International Linear Collider Documents
| ILC-doc-# |
Title |
Author(s) |
Topic(s) |
Last Updated |
| 488-v2 |
9mA beam current study at FLASH - DESY |
Julien Branlard |
High Level RF
General
Operations
Linac
|
01 Sep 2009 |
| 382-v6 |
NML Layout |
Jerry Leibfritz |
NML Systems
|
17 Jun 2009 |
| 487-v1 |
NML South Helium Refrigerator Test Run |
Dan Markley et al. |
Cryo-Systems
|
10 Jun 2009 |
| 477-v8 |
Project Management Monthly Report for Controls and LLRF |
Margaret Votava |
Controls
|
24 Jun 2008 |
| 484-v1 |
ESECon Description |
Gustavo I Cancelo |
Controls
|
13 Feb 2008 |
| 422-v1 |
Coupling Adjustments for Cavities with Gradient Disparities |
Julien Branlard et al. |
Cavities
|
12 Dec 2007 |
| 480-v1 |
Operational Solution to Obtaining a Flat Vector Sum from Multiple Cavities with Gradient Disparities |
Julien Branlard |
Simulation
Simulation
Cavities
Linac
|
12 Dec 2007 |
| 475-v2 |
NML Control System Requirements |
Kevin M. Krause |
Controls
NML Systems
|
10 Dec 2007 |
| 478-v1 |
ILC Controls Project Summary for September 2007 |
Mike Kucera et al. |
Controls
NML Systems
|
30 Nov 2007 |
| 476-v1 |
Control System Data Synchronization and Timing |
Ron Rechenmacher et al. |
Computing
|
19 Nov 2007 |
| 474-v1 |
ROLE BASED ACCESS FOR THE ACCELERATOR CONTROL SYSTEM IN THE LHC ERA - REQUIREMENTS |
Suzanne R Gysin |
Computing
|
10 Nov 2007 |
| 473-v1 |
Monthly Report of the ILC Controls Project for August, 2007 |
Mike Kucera et al. |
Controls
NML Systems
|
08 Nov 2007 |
| 424-v8 |
ILCTA Controls Project Planning |
Bakul Banerjee |
Controls
|
10 Sep 2007 |
| 472-v1 |
LLRF Workpackage - Evaluation of prototype systems at test facilities |
Brian Chase |
Controls
|
02 Nov 2007 |
| 471-v1 |
LLRF Workpackage - Software automation |
Brian Chase |
Controls
|
02 Nov 2007 |
| 470-v1 |
LLRF Workpackage - Software applications |
Brian Chase |
Controls
|
02 Nov 2007 |
| 469-v1 |
LLRF Workpackage - Software controller |
Brian Chase |
Controls
|
02 Nov 2007 |
| 468-v1 |
LLRF Workpackage - Hardware Digital |
Brian Chase |
Controls
|
02 Nov 2007 |
| 467-v1 |
LLRF Workpackage - Hardware Microwave |
Brian Chase |
Controls
|
02 Nov 2007 |
| 466-v1 |
LLRF Workpackage - System Requirements and Integration |
Brian Chase |
Controls
|
02 Nov 2007 |
| 465-v1 |
Controls Expression of Interest Form for EDR |
Margaret Votava |
Controls
|
31 Oct 2007 |
| 462-v1 |
Controls Work Package - Automation |
Kay Rehlich |
Controls
|
25 Oct 2007 |
| 461-v1 |
Controls Workpackage - Applications |
Kay Rehlich |
Controls
|
25 Oct 2007 |
| 460-v2 |
Controls talk for Area Team |
Margaret Votava |
Controls
|
24 Oct 2007 |
| 452-v2 |
Controls Work Package - Engineering |
Margaret Votava |
Controls
|
23 Oct 2007 |
| 457-v2 |
Controls Work Package - Timing |
Margaret Votava |
Controls
|
23 Oct 2007 |
| 455-v2 |
Controls Work Package - Software Development |
Margaret Votava |
Controls
|
23 Oct 2007 |
| 458-v2 |
Controls Work Package - Project Management |
Margaret Votava |
Controls
|
23 Oct 2007 |
| 456-v2 |
Controls Work Package - Integration |
Margaret Votava |
Controls
|
23 Oct 2007 |
| 449-v2 |
Controls Work Package - Electronics Platform |
Kazuro Furukawa et al. |
Controls
|
20 Oct 2007 |
| 451-v2 |
Controls Work Package - Controls System Architecture |
Claude Saunders |
Controls
|
20 Oct 2007 |
| 450-v2 |
Controls Work Package - High Availability |
Claude Saunders |
Controls
|
20 Oct 2007 |
| 454-v2 |
Controls Work Package - Configuration |
Margaret Votava |
Controls
|
20 Oct 2007 |
| 453-v1 |
oops - delete |
Margaret Votava |
Controls
|
20 Oct 2007 |
| 459-v1 |
Controls Work Package - Safety Systems |
Margaret Votava |
Controls
|
20 Oct 2007 |
| 313-v5 |
Understanding the Arrow ATCA Starter Kit |
Michael J. Haney et al. |
Controls
|
02 Oct 2007 |
| 447-v1 |
ILC Controls Project Summary for July 2007 |
Mike Kucera et al. |
Controls
NML Systems
|
02 Oct 2007 |
| 443-v1 |
NML Schedule for Testing Cryomodule 1 (9_20_07) |
Jerry Leibfritz |
NML Systems
|
26 Sep 2007 |
| 442-v1 |
NML Overview Talk 9_10_07 |
Jerry Leibfritz |
NML Systems
|
26 Sep 2007 |
| 441-v2 |
Horizontal Test Stand Control System |
Bill Marsh |
Controls
Computing
|
19 Sep 2007 |
| 437-v2 |
ILC Controls Project Summary for June 2007 |
Mike Kucera et al. |
Controls
|
24 Jul 2007 |
| 430-v2 |
How-To: Configure an ATCA Short Rack Test Stand |
Claude Saunders |
Controls
Software Tools
|
23 Jul 2007 |
| 440-v1 |
Timing/Phase Reference Development for APS SPX |
Frank Lenkszus |
Controls
NML Systems
|
23 Jul 2007 |
| 431-v2 |
ILCTA Webserver Proposal |
Andrey Petrov |
Computing
|
27 Jun 2007 |
| 410-v2 |
Disk Layout/Productization Proposal |
Ron Rechenmacher et al. |
Software Tools
|
22 Jun 2007 |
| 428-v1 |
CONTROLS, LLRF AND INSTRUMENTATION SYSTEMS FOR ILC TEST FACILITIES AT FERMILAB |
Brian Chase et al. |
Controls
NML Systems
|
21 Jun 2007 |
| 427-v1 |
ILC Controls Project Summary for May 2007 |
Mike Kucera et al. |
Controls
|
20 Jun 2007 |
| 423-v1 |
ILC Controls Project Summary for April 2007 |
Mike Kucera et al. |
Controls
|
06 Jun 2007 |
| 419-v1 |
Discussions about SiD Tracking Code Design - Part 1. |
Norman Graf et al. |
SiD
|
09 May 2007 |
| 418-v1 |
FNAL EPICS Naming Convention |
Sharon Lackey et al. |
Controls
|
07 May 2007 |
| 412-v2 |
ILC Controls Project Summary for March 2007 |
Mike Kucera et al. |
Controls
|
18 Apr 2007 |
| 414-v1 |
Epics ILCTA Archiving |
Vladimir Sirotenko |
General
Controls
Software Tools
|
17 Apr 2007 |
| 413-v1 |
ILCTA Controls Status April 2007 |
Margaret Votava |
Controls
|
12 Apr 2007 |
| 295-v2 |
Timing and Amplitude tolerances for Crab Cavity |
Mike Church |
Simulation
Controls
Cavities
Beam Delivery
|
09 Apr 2007 |
| 408-v1 |
ILC VO Purpose and User Rules |
Lynn Garren |
Grid
|
29 Mar 2007 |
| 401-v2 |
ILC Controls Project Summary for February 2007 |
Mike Kucera et al. |
Controls
|
27 Mar 2007 |
| 402-v6 |
Some Thoughts on Hits, Geometry ... |
Rob Kutschke et al. |
SiD
Software Tools
|
26 Mar 2007 |
| 403-v1 |
ART workpackage technical progress report for controls |
Margaret Votava |
Controls
|
19 Mar 2007 |
| 332-v12 |
Controls Commodity Computing Architecture |
Margaret Votava |
Controls
|
12 Mar 2007 |
| 400-v3 |
Ideas for Tracking data flow in SiD software |
Rob Kutschke |
Software Tools
|
08 Mar 2007 |
| 392-v4 |
A Cartoon Description of Linear Accelerators |
Rob Kutschke |
Controls
|
26 Feb 2007 |
| 390-v1 |
ILC Controls Project Summary for January 2007 |
Mike Kucera et al. |
Controls
|
12 Feb 2007 |
| 381-v1 |
ILCTA Instrumentation/Controls Poster for Detector Test Beam Workshop |
Gianni Tassotto et al. |
Controls
|
17 Jan 2007 |
| 380-v1 |
ILC Controls Talk for AD Controls Department |
Margaret Votava |
Controls
|
09 Jan 2007 |
| 378-v1 |
ZH example tutorial programs -- |
John Yoh |
Data Sets
|
21 Dec 2006 |
| 325-v18 |
NML Control System Requirements |
Mike Kucera et al. |
Controls
|
11 Dec 2006 |
| 346-v1 |
Agenda: 4th Concept Detector at Fermilab |
John Hauptman |
4th Concept
|
30 Nov 2006 |
| 368-v1 |
4th Concept and MDI issues |
Alexander Mikhailichenko |
4th Concept
|
30 Nov 2006 |
| 367-v1 |
INFN R&D on SiPM Applications to ILC Calorimetry |
Riccardo de Sangro |
4th Concept
Silicon
|
30 Nov 2006 |
| 366-v1 |
The muon system of the 4th detector concept detector |
Francesco Grancagnolo |
4th Concept
PID
|
30 Nov 2006 |
| 365-v1 |
Multiple Readout Calorimetry for the 4th Concept |
Aldo Penzo |
4th Concept
CAL
|
30 Nov 2006 |
| 364-v1 |
4th Concept |
John Hauptman |
4th Concept
CAL
|
30 Nov 2006 |
| 361-v1 |
ILCroot: the Software Framework of 4th Concept |
Corrado Gatto |
4th Concept
IlcRoot
|
22 Nov 2006 |
| 360-v1 |
4th Concept Detector Performance |
Corrado Gatto |
4th Concept
IlcRoot
|
22 Nov 2006 |
| 355-v1 |
Muon acceptance in SiD |
Caroline Milstene |
SiD
|
21 Nov 2006 |
| 356-v1 |
Dual Readout Calorimetry for the ILC |
John Hauptman |
CAL
|
21 Nov 2006 |
| 357-v1 |
Ultimate Hadron Calorimetry |
John Hauptman |
CAL
|
21 Nov 2006 |
| 350-v1 |
State of Software |
Corrado Gatto |
IlcRoot
Simulation
|
21 Nov 2006 |
| 347-v1 |
Beam Background and Detector Layout |
Corrado Gatto |
4th Concept
|
21 Nov 2006 |
| 348-v1 |
The DCR, push-pull, plans |
John Hauptman |
4th Concept
|
21 Nov 2006 |
| 349-v1 |
Solenoids, structures, and supports |
Bob Wands |
4th Concept
|
21 Nov 2006 |
| 351-v1 |
Drawings in 3-D |
Ingrid Fang |
4th Concept
|
21 Nov 2006 |
| 352-v1 |
Thoughts on the solenoids; parameter list |
Ryuji Yamada |
4th Concept
|
21 Nov 2006 |
| 353-v1 |
ILCroot, simulation, and pixel vertex detector |
Anna Mazzacane |
4th Concept
IlcRoot
|
21 Nov 2006 |
| 354-v1 |
Plans for 4th, SiD, and ILCroot |
Corrado Gatto |
4th Concept
IlcRoot
|
21 Nov 2006 |
| 358-v1 |
Description of the Fourth Concept Detector for the ILC |
Corrado Gatto et al. |
4th Concept
|
21 Nov 2006 |
| 359-v1 |
4th Concept Answers to MDI Questions |
John Hauptman et al. |
4th Concept
|
21 Nov 2006 |
| 2-v8 |
ilcsim.fnal.gov |
Lynn Garren |
Simulation
Simulation
|
24 Oct 2006 |
| 340-v1 |
atca conference summary |
Ron Rechenmacher |
Controls
|
24 Oct 2006 |
| 333-v1 |
Controls Status |
Margaret Votava |
NML Systems
|
06 Oct 2006 |
| 317-v1 |
Minutes from 9-1-06 NML Systems meeting |
Ralph Pasquinelli |
RF Sources
|
07 Sep 2006 |
| 315-v1 |
New Muon Lab RF kick off meeting |
Sergei Nagaitsev |
RF Sources
|
01 Sep 2006 |
| 314-v1 |
Current NML Layout |
Mike Kucera |
Controls
|
29 Aug 2006 |
| 276-v14 |
ILC Controls Requirements Spreadsheets |
Claude Saunders |
Controls
|
12 Jul 2006 |
| 305-v4 |
Evaluation of Electronic Logbooks for Use at the FNAL ILC Test Areas |
Suzanne R Gysin et al. |
Software Tools
|
30 Jun 2006 |
| 306-v3 |
Electronic Logbooks for Use at ILC Test Areas at FNAL |
Rob Kutschke |
Software Tools
|
29 Jun 2006 |
| 304-v1 |
WebEx Demo |
Margaret Votava |
General
|
27 Jun 2006 |
| 303-v1 |
Q&A with Matthias Clausen about DESY-IHEP logbook |
Rob Kutschke |
Software Tools
|
26 Jun 2006 |
| 302-v1 |
Discussion with Camille Ginsburg and Andy Hocker |
Rob Kutschke |
Software Tools
|
23 Jun 2006 |
| 283-v5 |
Logbook Feature list |
Suzanne R Gysin |
Software Tools
|
19 Jun 2006 |
| 292-v5 |
Summary of Architecture of Elog Candidates |
Rob Kutschke |
Software Tools
|
02 Jun 2006 |
| 296-v1 |
Q&A Report for HepBook |
Rob Kutschke |
Software Tools
|
02 Jun 2006 |
| 294-v2 |
ILC Controls Fast Feedback Rates and Computing Requirements |
Margaret Votava |
Controls
|
01 Jun 2006 |
| 293-v1 |
ILC Controls Linac DAQ Data Flow and Rates |
John Carwardine |
Controls
|
30 May 2006 |
| 291-v1 |
Accelerator Division Elog Q&A |
Wally F Kissel |
Operations
Software Tools
|
26 May 2006 |
| 288-v2 |
Architecture of SLAC's ELOG interview q&a |
Janice L Nelson |
Operations
Software Tools
|
26 May 2006 |
| 290-v1 |
Use-Case List from Janice Nelson |
Janice L Nelson |
Operations
Software Tools
|
26 May 2006 |
| 286-v1 |
Survey of Electronic Logbooks Used at CERN |
Elvin R Harms |
Software Tools
|
22 May 2006 |
| 285-v1 |
Plan of Attack for ILCTA Electronic Logbook TaskForce |
Rob Kutschke |
Software Tools
|
22 May 2006 |
| 284-v1 |
Logbook requirements |
Suzanne R Gysin |
Software Tools
|
22 May 2006 |
| 282-v1 |
REVIEW OF TWO YEARS EXPERIENCE WITH AN ELECTRONIC LOGBOOK |
Suzanne R Gysin |
Software Tools
|
22 May 2006 |
| 281-v1 |
Web Conferencing Tool Evaluation |
Kurt Biery et al. |
Controls
Software Tools
|
18 May 2006 |
| 243-v2 |
DR and BDS Controls Requirements Spreadsheet |
Claude Saunders |
Damping Rings
Controls
Beam Delivery
|
01 May 2006 |
| 273-v1 |
Revealing the Hidden Nature of Space and Time |
Barry Barish |
General
|
29 Apr 2006 |
| 271-v1 |
Inflation/Deflation Costing Spreadsheet |
Erik Gottschalk |
Controls
|
27 Apr 2006 |
| 263-v1 |
Analysis of Phase and Amplitude Sensitivity of "300B" Bunch Compressor and Linac |
Mike Church |
Simulation
Bunch Compressors
Linac
LET
|
14 Apr 2006 |
| 262-v1 |
ILC Cost Estimating Activities - Peter Garbincius |
Peter Garbincius |
General
|
12 Apr 2006 |
| 195-v3 |
ILC Controls Global Group Work Breakdown Structure |
Ned Arnold et al. |
Controls
|
04 Apr 2006 |
| 247-v1 |
Status of Beam Dyanics Calculations for ILCTA |
Philippe Piot |
Beam Dynamics
|
06 Mar 2006 |
| 171-v4 |
ILC Control System Generic Functional Diagram |
Ned Arnold |
Controls
|
25 Feb 2006 |
| 203-v2 |
LLRF and Diagnostics Architecture |
Kay Rehlich |
Controls
|
14 Feb 2006 |
| 208-v1 |
LLRF and Diagnostics Architecture |
Kay Rehlich |
Controls
|
10 Feb 2006 |
| 200-v2 |
ILC bunch-compressor and linac rf requirements |
Sergei Nagaitsev |
Controls
|
09 Feb 2006 |
| 201-v1 |
RTES Approach to Software Fault Tolerance |
Jim Kowalkowski |
Software Tools
|
09 Feb 2006 |
| 194-v1 |
DocDB Overview for ILC EDMS |
Eric Vaandering |
Software Tools
|
08 Feb 2006 |
| 188-v1 |
XFEL architecture |
Kay Rehlich |
Controls
|
08 Feb 2006 |
| 185-v1 |
Controls activities - SLAC |
Marc Ross |
Controls
|
08 Feb 2006 |
| 180-v1 |
Controls Global Group Tasks |
John Carwardine |
Controls
|
07 Feb 2006 |
| 174-v1 |
Presentation for NI Meeting |
Margaret Votava |
Controls
|
01 Feb 2006 |
| 173-v1 |
ILC Cost Model |
Ray Larsen |
Controls
|
31 Jan 2006 |
| 116-v2 |
10.10 ILC BCD Beam Position Monitors |
Hans Braun et al. |
Diagnostics
|
29 Jan 2006 |
| 143-v1 |
ILC Controls Global Group Topic Group Membership |
John Carwardine et al. |
Controls
|
24 Jan 2006 |
| 170-v1 |
Notes from Discussion Session on Data Collection |
John Carwardine |
Controls
|
24 Jan 2006 |
| 169-v1 |
Notes from Discussion Session on High Availability for Controls |
John Carwardine |
Controls
|
24 Jan 2006 |
| 163-v1 |
ILC Controls High Availability Software |
Claude Saunders |
Controls
|
24 Jan 2006 |
| 164-v1 |
Availability and Controls |
T Himel |
Controls
|
24 Jan 2006 |
| 168-v1 |
Notes from Discussion Session on Timing |
John Carwardine |
Controls
|
24 Jan 2006 |
| 162-v1 |
Timing & RF distribution |
Josef Frisch |
Controls
|
24 Jan 2006 |
| 158-v1 |
Integrated Timing System |
Frank Lenkszus |
Controls
|
24 Jan 2006 |
| 161-v1 |
ILC Operation |
Marc Ross |
Operations
|
24 Jan 2006 |
| 167-v1 |
Notes from Discussion Session on Feedback |
John Carwardine |
Controls
|
24 Jan 2006 |
| 159-v1 |
Orbit feedback at the APS storage ring |
John Carwardine |
Controls
|
24 Jan 2006 |
| 160-v1 |
BDS beam feedback system |
Phil Burrows |
Beam Delivery
|
24 Jan 2006 |
| 165-v1 |
DR to IP Beam Transport Simulations with Intra-Train Feedback |
Glen White |
Controls
|
24 Jan 2006 |
| 166-v1 |
Feedback Systems for ILC |
Linda Hendrickson |
Controls
|
24 Jan 2006 |
| 157-v1 |
Introduction and meeting objectives |
John Carwardine |
Controls
|
24 Jan 2006 |
| 156-v1 |
ILC Instrumentation Overview |
Marc Ross |
Diagnostics
|
18 Jan 2006 |
| 139-v1 |
LLRF Results at A0 |
Brian Chase |
Controls
|
12 Dec 2005 |
| 97-v1 |
Topics for Weekly GG2 Thursday Meetings |
Marc Ross |
Controls
|
09 Dec 2005 |
| 137-v1 |
Global Group 2 Update - Frascati GDE meeting Dec 8,2005 |
Marc Ross |
Controls
|
08 Dec 2005 |
| 77-v1 |
Vector Sum Control of Pulsed Accelerating Fields in Lorentz Force Detuned Superconducting Cavities |
Thomas Schilcher |
Controls
|
14 Nov 2005 |
| 117-v1 |
10.11 ILC BCD Transverse Profile Monitor System |
Grahame Blair et al. |
Diagnostics
|
11 Nov 2005 |
| 126-v1 |
10.6 Low Level RF |
Brian Chase et al. |
Controls
|
11 Nov 2005 |
| 111-v1 |
10.2 ILC BCD Timing System |
Frank Lenkszus |
Controls
|
11 Nov 2005 |
| 110-v1 |
10.1 ILC BCD Controls Standard Architecture Proposal |
Matthias Clausen et al. |
Controls
|
11 Nov 2005 |
| 125-v3 |
10.7 ILC BCD Beam-Based Feedback Systems |
John Carwardine |
Controls
|
10 Nov 2005 |
| 105-v1 |
ILC Controls Software Architecture |
Claude Saunders |
Controls
|
08 Nov 2005 |
| 115-v3 |
10.8 BCD Controls - Instrumentation Integration |
John Carwardine et al. |
Controls
|
07 Nov 2005 |
| 119-v1 |
Emittance measurement using laserwires |
Grahame Blair |
Controls
|
07 Nov 2005 |
| 118-v1 |
10.12 ILC BCD Longitudinal Diagnostics |
Marc Ross |
Diagnostics
|
06 Nov 2005 |
| 108-v1 |
OBSERVATION OF FEMTOSECOND BUNCH LENGTH USING A TRANSVERSE DEFLECTING STRUCTURE |
Marc Ross |
Diagnostics
|
06 Nov 2005 |
| 114-v1 |
10.5 ILC BCD Machine Protection System |
Marc Ross |
Controls
|
06 Nov 2005 |
| 113-v1 |
10.4 Global Accelerator Network |
Margaret Votava et al. |
Controls
|
06 Nov 2005 |
| 112-v1 |
10.3 Diagnostic Interlock Layer |
Ray Larsen |
Controls
|
06 Nov 2005 |
| 102-v1 |
Performance Specification for the Power System Control Board (PSCB) |
Paul Bellomo et al. |
Controls
|
06 Nov 2005 |
| 103-v1 |
Diagnostic Interface Layer |
Ray Larsen |
Controls
|
06 Nov 2005 |
| 107-v1 |
Technical Systems Configurations -Electrical Subsystem: Instrumentation – Timing |
Ray Larsen |
Controls
|
06 Nov 2005 |
| 109-v1 |
10.0 ILC BCD Instrumentation and Controls Introduction |
Marc Ross |
Controls
|
06 Nov 2005 |
| 106-v1 |
High Availability Software Architecture for ILC |
John Carwardine |
Controls
|
06 Nov 2005 |
| 104-v1 |
Instrumentation Standard Architectures for |
Ray Larsen |
Controls
|
06 Nov 2005 |
| 101-v1 |
Bunch Length Measurement using a Laser-wire in Damping Ring |
Junji Urakawa |
Controls
|
06 Nov 2005 |
| 100-v1 |
Emittance Measurement using a Laser-wire in Damping Ring |
Junji Urakawa |
Controls
|
06 Nov 2005 |
| 99-v1 |
Engineering and Maintenance Concepts for ILC Remote Operations |
Ray Larsen |
Controls
|
06 Nov 2005 |
| 84-v1 |
Providing Open Architecture High Availability Solutions |
John Carwardine |
Controls
|
27 Oct 2005 |
| 81-v1 |
Clustering Studies at Fermilab, Progress Report |
Adam Para |
CAL
|
19 Oct 2005 |
| 80-v1 |
Jets and jet-jet mass resolution at the ILC |
Adam Para |
CAL
|
19 Oct 2005 |
| 71-v1 |
ATCA Overview |
Bob Downing |
Controls
|
07 Oct 2005 |
| 52-v1 |
ILC Electronics Manufacturing Opportunites |
Ray Larsen |
Controls
|
07 Oct 2005 |
| 72-v1 |
Controls Data Spreadsheet |
Ferdinand Willeke |
Controls
|
22 Sep 2005 |
| 56-v1 |
GDE and Regional Effots |
Gerry Dugan |
LCFOA
|
21 Sep 2005 |
| 55-v1 |
Status of the International Linear Collider and Importance of industrialization |
Barry Barish |
LCFOA
|
21 Sep 2005 |
| 54-v1 |
Welcome and Fermilab View of the ILC |
Piermaria Oddone |
LCFOA
|
21 Sep 2005 |
| 70-v0 |
Short Working Group Summaries |
Shekhar Mishra |
LCFOA
|
21 Sep 2005 |
| 69-v0 |
LCFOA Summary |
Tony Favale et al. |
LCFOA
|
21 Sep 2005 |
| 68-v0 |
Discussion of Plan for the Day |
Nigel Lockyer |
LCFOA
|
21 Sep 2005 |
| 67-v0 |
ILC Communication |
Elizabeth Clements |
LCFOA
|
21 Sep 2005 |
| 66-v0 |
European Linear Collider Forum |
Michael Peiniger |
LCFOA
|
21 Sep 2005 |
| 65-v0 |
Linear Collider Forum Of Americas |
Ken Olsen |
LCFOA
|
21 Sep 2005 |
| 64-v0 |
Japan Linear Collider Forum |
Norihiko Ozaki |
LCFOA
|
21 Sep 2005 |
| 63-v0 |
Industrialization of XFEL in Europe |
Dieter Proch |
LCFOA
|
21 Sep 2005 |
| 62-v0 |
ILC R&D at International Laboratories |
Nick Walker |
General
LCFOA
|
21 Sep 2005 |
| 61-v0 |
ILC R&D at International Laboratories |
Chris Adolphsen |
LCFOA
|
21 Sep 2005 |
| 60-v0 |
ILC R&D at International Laboratories |
Robert Kephart |
LCFOA
|
21 Sep 2005 |
| 59-v0 |
ILC Accelerator Overview |
Shekhar Mishra |
General
LCFOA
|
21 Sep 2005 |
| 58-v0 |
ILC Detector Overview |
Marcel Demarteau |
General
LCFOA
|
21 Sep 2005 |
| 57-v0 |
Physics Discovery Potential of the ILC |
Marcela Carena |
General
LCFOA
|
21 Sep 2005 |
| 53-v1 |
LCFOA Membership Letter |
Ken Olsen |
LCFOA
|
21 Sep 2005 |
| 51-v1 |
Controls & Instrumentation Standard Architecture Options |
Ray Larsen |
Controls
|
20 Sep 2005 |
| 50-v1 |
High Availability Electronics Architectures & Standards for ILC |
Ray Larsen |
Controls
|
20 Sep 2005 |
| 49-v1 |
Diagnostic Interlock Layer (DIL) |
Ray Larsen |
Controls
|
20 Sep 2005 |
| 48-v1 |
Tunnel Electronics Baseline Issues |
Ray Larsen |
Controls
|
20 Sep 2005 |
| 43-v1 |
GG2 - Comments on control system items discussed at Snowmass 2005 |
John Carwardine |
Controls
|
20 Sep 2005 |
| 47-v1 |
GG2 - Question 29. Linac Diagnostic Sections |
Marc Ross |
Controls
|
13 Sep 2005 |
| 46-v1 |
GG2 - Question 33. Machine Protection System |
Marc Ross |
Controls
|
13 Sep 2005 |
| 45-v1 |
GG2 - Question 43. Re-entrant or Cavity BPMs |
Marc Ross |
Controls
|
13 Sep 2005 |
| 44-v1 |
GG2 - Instrumentation Summary |
Marc Ross |
Controls
|
13 Sep 2005 |
| 42-v1 |
Considerations on Conventional Magnet Systems |
Marc Ross |
Controls
|
13 Sep 2005 |
| 40-v1 |
Snowmass 2005 ILC Control System |
John Carwardine |
Controls
|
02 Sep 2005 |
| 39-v1 |
NLC Global Controls Software |
Hamid Shoaee |
Controls
|
02 Sep 2005 |
| 38-v1 |
NLC Global Controls Architecture |
Marc Crane |
Controls
|
02 Sep 2005 |
| 36-v1 |
Global Group 2 Summary presentation - writing assignments... |
Marc Ross |
Controls
|
01 Sep 2005 |
| 35-v1 |
NLC Phase and Timing Distribution |
Josef Frisch |
Controls
|
01 Sep 2005 |
| 28-v1 |
Critical Choices for ILC BCD |
T Himel |
None
|
22 Aug 2005 |
| 16-v1 |
SiD R&D Perspective |
Andy White |
SiD
|
19 Aug 2005 |
| 27-v1 |
VXDBAsedReco Tracking Performance Studies |
Bruce Schumm |
SiD
|
19 Aug 2005 |
| 26-v1 |
SiD VXD |
Su Dong |
SiD
|
19 Aug 2005 |
| 25-v1 |
SiD MDI issues |
Phil Burrows |
SiD
|
19 Aug 2005 |
| 24-v1 |
SiD Tracking |
Marcel Demarteau |
SiD
|
19 Aug 2005 |
| 23-v1 |
Optimizing SiD |
John A. Jaros |
SiD
|
19 Aug 2005 |
| 22-v1 |
SiD Design Study Issues |
Marty Breidenbach |
SiD
|
19 Aug 2005 |
| 21-v1 |
Simulating the Silicon Detector |
Norman Graf |
SiD
Simulation
|
19 Aug 2005 |
| 20-v1 |
SiD Cost |
Marty Breidenbach |
SiD
|
19 Aug 2005 |
| 19-v1 |
SiD Benchmarking |
Tim Barklow |
SiD
|
19 Aug 2005 |
| 18-v1 |
SiD Solenoid |
Harry Weerts |
SiD
|
19 Aug 2005 |
| 17-v1 |
SiD Muon Detector |
Henry Band |
SiD
|
19 Aug 2005 |
| 15-v1 |
The SiD Calorimeter |
Jose Repond |
SiD
|
19 Aug 2005 |
| 13-v1 |
Multi-Bunch Integrated Simulations |
Glen White |
Simulation
|
19 Aug 2005 |
| 12-v1 |
Feedback Studies for ILC |
Nan Phinney |
Beam Parameters
|
19 Aug 2005 |
| 11-v1 |
Discrete Vertical Bends for the LET |
Peter Tenenbaum |
LET
|
19 Aug 2005 |
| 10-v1 |
Main Linac Simulation - Main Linac Alignment Tolerances - single bunch effects |
Kiyoshi Kubo |
Simulation
|
19 Aug 2005 |
| 9-v3 |
WG1 Plenary |
Peter Tenenbaum |
Beam Parameters
|
19 Aug 2005 |
| 8-v1 |
Performance Simulation of the LiCAS-RTRS Survey Train |
Jacek Ciborowski |
Simulation
|
19 Aug 2005 |
| 7-v1 |
Integrated Simulation - from the Main Linac to IP |
Kiyoshi Kubo |
Simulation
|
19 Aug 2005 |
| 6-v1 |
For Overall Layout of ILC - Beam Line Layout Choices |
Kiyoshi Kubo |
Beam Parameters
|
19 Aug 2005 |
| 5-v1 |
Two Stage Bunch Compressor Proposal |
Peter Tenenbaum |
Bunch Compressors
|
19 Aug 2005 |
| 1-v1 |
Building SLIC at FNAL |
Lynn Garren |
Simulation
|
19 Aug 2005 |
| 14-v1 |
SiD Design Goals and Plans for Snowmass |
Harry Weerts |
SiD
|
19 Aug 2005 |
Number of documents found: 237
DocDB Version 8.7.11, contact
ILC Document Database Administrators
Execution time: 3 wallclock secs ( 1.48 usr + 0.22 sys = 1.70 CPU)